COLLEGE OF THE HOLY CROSS
St. Joseph's Chapel + Dinand Library
The historic chapel on campus required tedious attention to detail. In order to maintain the unique architecture when installing mechanical systems, planning and precision were imperative to the success of the project. The project required system conversions, added mechanical equipment, and an updated Building Management System. With preparation and expertise this project illustrates our ability to meet our clients' specific needs.
GLOBAL FOUNDRIES
Basebuild + Tool Hook-up
This multi-billion-dollar semiconductor plant has been one of our largest achievements. While meeting the demands for expedited schedules, we fabricated and installed process exhaust systems and make-up air systems throughout the campus. Our scope of work required duct installations ranging from 120 inches to 4 inches in diameter for both basebuild and tool hook-up projects.
YALE UNIVERSITY
Kline Chemistry Lab
With extensive coordination efforts, we were able to collaborate with the construction team to ensure a quality project. The scope of work included installing HVAC ductwork, high plume fans, and custom stack systems. The industrial air systems we installed support a full laboratory exhaust heat recovery system to ensure the highest level of energy efficiency.